10/11/10
Revision as of 09:05, 12 October 2010 by Mattstultz (talk | contribs) (New page: A3 First meeting was 10/11/10. * Matt S, Ed P, Matt M, Chris T, Doug P * Check from Component One has not yet arrived. * This was a discussion only meeting. Target Launch date is 10/...)
First meeting was 10/11/10.
- Matt S, Ed P, Matt M, Chris T, Doug P
- Check from Component One has not yet arrived.
- This was a discussion only meeting.
Target Launch date is 10/31/10 with following weekends as rain dates.
Proposed Payload:
- Existing box.
- Existing chute. (maybe)
- Existing Camera
- Existing APRS tracker/radio
- Existing GPS
- Three Temperature sensors:
- Outside
- Inside
- Battery
- Three-axis accelerometer
- Log to SD card
- will SD card work if it gets cold?